Causing equipment to shut down and not start properly!

Case Study #3 1pg pdf. Electricians recorded information with a 1 phase meter, to find a solution for Power problems. The first thought by the client was, it must be the Utility’s fault. After installing the Phaseback VSGR, these recordings were made at the resistor in the VSGR, showing what is being cleaned from the system. Why install a Phaseback VSGR? To: Stop the unplanned shutdowns, operation malfunctions & Increase production output.

A Michigan Automotive component manufacturing facility with dozens of CNC machines had problems with unstable voltages, harmonics, noise & switching transients. 180 Hz through 3,560,000,000 Hz (Extreme High Frequency Noise) from 100% harmonic loads, and periodic Utility capacitor switching caused the nominal frequency to be 106.1mHz, nominal. Grounds forming in the ungrounded power system were causing servo & spindle drives to fault. With the Phaseback VSGR (AFPT) added to the power system, the facility could operate trouble-free, & the grounds could be located while production continued to run. Most of the problems in this case are created on the secondary side of the Utility transformer. It could have taken weeks to find and fix all of the problems, but installing a Phaseback VSGR solved them. Note the Voltage Harmonic Spectrum = 3.56GHz highest magnitude, which is similar to that of Solar Flare or EMP (electromagnetic pulse), was removed by Phaseback VSGR.

This case study is just one of many examples where customers have saved money, time, equipment, and most importantly, the lives of their employees.

Benefits Provided By Phaseback VSGR (Voltage Stabilizing Ground Reference):

Notes: 12.AFPT provides the “Perfect Electrical System” = Transformer + VSGR.

13. VSGR is effective on 10 points above, and for Grounded WYE, we offer the Harmonic Silencer for harmonics only on 3 phase Grounded WYE systems.

contact us

Get a fast quote on you next project!
Cy Cates: 1+ (832) 647-4606

More To Explore

Arc Flash problems are solved by VSGR!

Global 1200 pipelaying vessel was grounded by intermittent Voltage events! This Work-boat, new & unable to do a day’s work, because of outages & exploding