A Michigan Manufacturing Company had a Problem with downtime, caused by equipment malfunction. The study determined that Drives and Controls were faulting, due to Voltage imbalance (single phase sags) Download 2 page PDF at bottom of post.

Action item: Phaseback VSGR was installed which solved the problems.

Results: Efficiency, reliability, and safety remain significantly improved.