A Michigan Manufacturing Company had a Problem with downtime, caused by equipment malfunction. The study determined that Drives and Controls were faulting, due to Voltage imbalance (single phase sags) Download 2 page PDF at bottom of post.
![](https://i0.wp.com/supertran.us/wp-content/uploads/2023/04/quality-power-is-achieved.webp?resize=800%2C463&ssl=1)
Action item: Phaseback VSGR was installed which solved the problems.
Results: Efficiency, reliability, and safety remain significantly improved.
#Lightning #StopArcFlashDamage #StopLightningDamage #PowerQuality #arcflashprevention #SPD #grounding #savemoneyonelectricity