Cy Cates (832)647-4606    CyCates@CyCates.com

Spreadsheet download – Phaseback DVS efficiency payback

Share This Post

This spreadsheet helps to determine payback when installing Phaseback DVS on Load side of the VFD.

Other savings will come from longer motor life and using less expensive cables. 1000 ft distance from drive to motor has been tested with no voltage issues remaining after the installation. Use this spreadsheet to forecast your energy savings!

#harmonicmitigation #singlephaseprotection #empprotection #StopArcFlashDamage #ground #reduceenergycost #voltagestabilizer #transient #PowerQuality #6000Varcflashtest #standingwave #reflectedwave #VFDcable

contact us

Get a fast quote on you next project!
Cy Cates: 1+ (832) 647-4606

More To Explore

Arc Flash problems are solved by VSGR!

Global 1200 pipelaying vessel was grounded by intermittent Voltage events! This Work-boat, new & unable to do a day’s work, because of outages & exploding